1. Purpose#
A requirement that cannot be traced to a test, and a test that cannot be traced to a requirement, are both waste. This matrix is the single place where that link is maintained.
It answers four questions on demand:
- Where did this requirement come from?
- Which experiment will demonstrate it?
- What is its current evidence status?
- If it changes, what else is affected?
Maintenance rule: this matrix is updated in the same change as any requirement or experiment change. A matrix that lags the documents is worse than none, because it is trusted and wrong.
2. Status vocabulary#
| Status | Meaning |
|---|---|
| Aspirational | A target with no evidence it is achievable. Must not be quoted externally. |
| Derived | Traced to a stated engineering need; not yet confirmed against Sunrack project practice |
| Confirmed | Agreed against real Sunrack project requirements |
| Validated | Demonstrated by Falcon measurement under V1-00 metrology and leakage rules |
| Analysed | An analytical feasibility verdict exists; measurement still required |
No requirement in this matrix is Validated. That is the purpose of the V1 campaign, and until then nothing here is a performance claim.
3. Measurement requirements#
| ID | Requirement | Source | Tier | Verified by | Gate | Status | Feasibility |
|---|---|---|---|---|---|---|---|
| MR-01 | Roof boundary ±(25 mm + 1 mm/m) | Area and module count | B | V1-00 RF-05, IN-04 | D | Derived | Analysed — achievable |
| MR-02 | Usable roof area ±2 % | Proposal and BOM quantity | B | V1-00 RF-01 | D | Derived | Analysed — achievable |
| MR-03 | Plane normal ±0.5° | Structural prefabrication | C | V1-00 IN-02, Exp. I | D | Derived | Analysed — large margin (F-6) |
| MR-04 | Azimuth for yield ±2° | Energy estimate | C | V1-00 IN-02 | D | Derived | Analysed — achievable |
| MR-05 | Plane offset / flatness ±25 mm | Packing and levelling | B | V1-00 IN-01, RF-01 | D | Derived | Analysed — achievable |
| MR-06 | Obstacle height ±50 mm | Shading analysis | B | V1-00 RF-05 | E | Derived | Analysed — probable |
| MR-07 | Obstacle plan position ±100 mm | Layout keep-outs | B | V1-00 RF-05 | E | Derived | Analysed — achievable |
| MR-08 | Parapet height ±25 mm | First-row setback | B | V1-00 RF-05 | E | Derived | Analysed — marginal |
| MR-09 | Structural member position ±15 mm over 5 m | Rail pre-cutting | A | Experiment H | — | Aspirational | Not achievable optically (F-12) |
| MR-10 | Far-field object ±500 mm at 20–50 m | Surrounding shading | D | V1-00 RF-04 | E | Derived | Analysed — achievable |
| MR-11 | Absolute position ±50 mm, optional mode | Site drawings, revisits | B | V1-00 RF-01 | D | Derived | Achievable with control only |
| MR-12 | Local distance ±(10 mm + 1 mm/m), L ≤ 10 m | General dimensioning | B | V1-00 IN-01, RF-01 | D | Derived | Analysed — marginal, key V1 question |
4. Functional requirements#
| ID | Requirement | Source | Verified by | Status |
|---|---|---|---|---|
| FR-01 | Flag marginal module rows within 150 mm | Tolerances §4.1 | Software test | Derived |
| FR-02 | State shadow sensitivity to height uncertainty | Tolerances §4.4 | Software test | Derived |
| FR-03 | Detect obstacles ≥150 mm within working range | Error budget §5.2 | V1-00 RF-05, Gate E | Derived |
| FR-04 | Report low-point-support regions, not silent gaps | Error budget §5.2 | V1-00 coverage metric | Derived |
| FR-05 | Determine purlin locatability before architecture freeze | Finding F-12 | Experiment H | Open — gates scope |
| FR-06 | Per-point motion compensation as a specified stage | Finding F-9 | V1-00 Stage 3 step 7 | Derived |
| FR-07 | Edges by plane intersection, never extreme-point picking | Finding F-7 | V1-00 §9.1 | Derived |
| FR-08 | Boresight ≤0.05°, verified at 8–15 m | Finding F-10 | V1-00 Stage 2 step 9, Gate C | Derived |
| FR-09 | Every reported dimension carries an uncertainty | Tolerances §3 | Software test | Derived |
| FR-10 | Distinguish relative from absolute measurements | Error budget §2 | Software test | Derived |
| FR-11 | In-scan operator feedback on coverage and tracking | Software plan §8 | V1 field use | Derived |
| FR-12 | Obtain legal-metrology opinion | Compliance §2 | Consultant opinion | Open |
| FR-13 | Consolidated compliance campaign with CB certificate | Compliance §4 | Certification plan | Derived |
| FR-14 | No compliance-affecting substitution without approval | Compliance §6 | Contract clause | Derived |
5. Data requirements — procurement filters#
The first three are hard filters. A sensor failing them is disqualified for the product, whatever else it offers.
| ID | Requirement | Source | Verified by | Status | Filter |
|---|---|---|---|---|---|
| DR-01 | Hardware timestamps with documented semantics | Finding F-8 | Vendor confirmation + Stage 3 | Derived | Hard |
| DR-02 | Inter-sensor synchronisation better than 1 ms | Finding F-8 | V1-00 Stage 3, Gate C | Derived | Hard |
| DR-03 | Per-point LiDAR timestamps | Finding F-9 | Vendor confirmation + Stage 1 | Derived | Hard |
| DR-04 | IMU ≥200 Hz, documented axes and units | Finding F-9 | Vendor confirmation | Derived | Hard |
| DR-05 | Raw or minimally processed measurement access | D-005 | Vendor confirmation + Stage 1 | Derived | Hard |
| DR-06 | Global shutter for tracking, colour and photogrammetry | Finding F-3 | Official specification | Derived | Strong preference |
| DR-07 | Readable, writable extrinsics with explicit frames | Finding F-10 | Stage 2 | Derived | Hard |
6. Product requirements#
| ID | Requirement | Status | Conflict |
|---|---|---|---|
| PR-01 | Device mass < 1 kg | Aspirational | Conflicts with preferred LiDAR class (F-5, D-023) |
| PR-02 | Sensor mass < 300 g | Aspirational | Same conflict |
| PR-03 | System power < 15 W | Aspirational | Host compute inclusion undefined |
| PR-04 | Battery runtime ≥ 2 h | Aspirational | Workload undefined |
| PR-05 | Scan duration ~1 min | Aspirational | Meaningless without roof area |
| PR-06 | Maximum useful range 25 m | Aspirational | Tier D only, not at Tier B tolerance |
| PR-07 | Working range 2–15 m | Derived | — |
| PR-08 | Horizontal FOV ≥ 90°, vertical ≥ 60° | Derived | — |
| PR-09 | Operating temperature 0–50 °C | Derived | May be optimistic for Indian rooftops |
| PR-10 | Ingress protection IP54+ | Derived | — |
| PR-11 | Laser Class 1 to IEC 60825-1, all fault conditions | Mandatory | Cannot be inherited from a component |
7. Software and licence requirements#
| ID | Requirement | Source | Status |
|---|---|---|---|
| SW-01 | Results traceable to dataset checksum, commit and config | Software plan §5.1 | Derived |
| SW-02 | Processing in a pinned container; digest recorded | Software plan §5.1 | Derived |
| SW-03 | Configuration version-controlled, not hand-edited | Software plan §5.1 | Derived |
| SW-04 | Reproducible metrics from a recorded configuration | Software plan §5.1 | Derived |
| SW-05 | All V1-00 metrics from one command | Software plan §5.1 | Derived |
| SW-06 | Checkpoint isolation enforced in software | V1-00 §7.7 | Derived — highest value |
| SW-07 | Sample size, reference uncertainty and exclusions with every metric | V1-00 §8.1 | Derived |
| SW-08 | Append-only results | Software plan §5.1 | Derived |
| SW-09 | No conformance claim without n and standard error | V1-00 §8.1 | Derived |
| SW-10 | Percentiles flagged unstable where n < 20 | V1-00 §8.1 | Derived |
| LIC-01 | No product-path component without recorded licence review | Software plan §7 | Derived — act now |
| LIC-02 | R&D-only and product-path use tracked separately | Software plan §7 | Derived |
| LIC-04 | Prefer permissive licences on the product path | Software plan §7 | Derived |
| LIC-07 | Software bill of materials reviewed every release | Software plan §7 | Derived |
| IP-01 | Freedom-to-operate search before architecture freeze | IP strategy §5 | Open |
| IP-05 | Contractor IP assignment before work starts | IP strategy §7 | Open — act now |
| IP-07 | Observe Indian foreign-filing restriction | IP strategy §7 | Open |
8. Coverage check#
| Experiment | Requirements verified |
|---|---|
| V1-00 Stage 1 | DR-01, DR-03, DR-05, Gate B |
| V1-00 Stage 2 | FR-08, DR-07, Gate C |
| V1-00 Stage 3 | DR-02, DR-04, FR-06, Gate C |
| V1-00 Stage 4 | MR-05, MR-12, Gate D |
| V1-00 Stage 5 | MR-12, trajectory metrics |
| V1-00 Stage 6 | MR-01, MR-02, MR-06, MR-07, MR-08, MR-10, MR-11, Gates D and E |
| Experiment G (photogrammetry) | MR-12 via path P, D-017 |
| Experiment H (purlin) | MR-09, FR-05, D-022 |
| Experiment I (angular bias) | MR-03, MR-04 |
| Software Phase S0 | SW-01 to SW-10, LIC-01 |
Requirements with no verification route yet#
These need either an experiment or a decision that they are out of scope. An unverifiable requirement is a defect in the requirement set.
| ID | Gap |
|---|---|
| FR-01, FR-02, FR-09, FR-10 | Software behaviour — needs a software test plan, not a field experiment |
| FR-11 | Needs a usability evaluation method; currently only informal field use |
| FR-12, FR-13, FR-14 | Depend on consultant and contract work, not measurement |
| PR-03 to PR-06, PR-09 | Cannot be verified until definitions are fixed (workload, roof area, compute inclusion) |
| PR-11 | Needs laser classification measurement on a Falcon-specific build |
| MR-09 | Verification route is Experiment H, which may return a negative result |
PR-03 to PR-06 are the notable gap. They are currently unverifiable as written, not merely unverified — "scan duration about 1 minute" has no roof area attached, and "power under 15 W" does not say whether host compute is included. Fixing the definitions is a prerequisite to testing them, and costs nothing but a decision.