SUNRACK TECHNOLOGIES LLP · PROJECT FALCON

Value Hypothesis and Business Case Framework

Framework — contains no financial figures; inputs must be supplied from Sunrack project records

Document ID

FALCON-PRJ-002

Version

0.1

Status

Framework — contains no financial figures; inputs must be supplied from Sunrack project records


1. The question this document exists to answer#

The Falcon documents describe what to build and how to test it. They do not state why it is worth building, or what would make it not worth building.

That gap matters more than it appears. Without a value model there is no basis for deciding how much to spend on R&D, no threshold for abandoning the programme, and no way to choose between a more accurate device and a cheaper one. Every engineering trade-off in this project — mass against accuracy, cost against range, scan speed against completeness — is ultimately a commercial trade-off, and it cannot be resolved from the technical documents alone.

This document deliberately contains no numbers. Inventing plausible-looking figures would be worse than leaving them blank, because they would be quoted. It sets out the model and names the inputs Sunrack must supply from its own records.


2. Three distinct value hypotheses#

These are not alternatives. They are three independent sources of value with very different risk profiles, and they should be assessed separately because the weakest one may be carrying the business case.

H1 — Internal efficiency: better surveys for Sunrack's own MMS projects#

Sunrack designs and manufactures mounting structures. Every project needs roof geometry. If surveys are currently slow, manual, error-prone or expensive, a scanner that improves them reduces cost on work Sunrack already wins.

Lowest risk, because Sunrack is its own first customer, the workflow is known, and no market has to be created.

Inputs needed:

Input Where it comes from
Surveys per year across all projects Project records
Hours per survey, including travel and office processing Project records
Fully loaded cost per survey Finance
Frequency of site revisits caused by inadequate survey data Project records
Frequency of rework or re-fabrication traced to survey error Production records
Cost of a typical rework instance Finance
Quotation-to-as-built variance on delivered projects Project records

H2 — Commercial differentiation: a capability Sunrack's competitors lack#

A digital roof survey producing a structure design and bill of materials faster and more reliably than a competitor's manual process is a reason for an EPC to choose Sunrack. The value is in won work and defended margin, not in survey cost.

Moderate risk — it depends on customers valuing the capability, which should be tested by asking a few of them before it is built.

Inputs needed: win rate against comparable bidders; typical margin per project; whether EPCs currently specify survey accuracy; whether any competitor already offers this; whether faster quotation turnaround affects win rate.

H3 — A product line: selling the device or the service to others#

Selling scanners, or survey-as-a-service, to EPCs and developers.

Highest risk and the largest commitment. It requires certification across markets, support, documentation, warranty and channel — everything in the compliance plan and the IP strategy — and it puts Sunrack in competition with established survey-instrument companies.

H3 should not carry the business case for the R&D programme. If Falcon is only justified by becoming a scanner vendor, it is a speculative hardware venture wearing the clothes of a process improvement. If H1 and H2 together justify the investment, then H3 becomes genuine upside rather than a requirement — and that is a far more robust position to invest from.


3. The cost side#

Category Notes
R&D engineering The dominant cost. SLAM and state-estimation skills are scarce and expensive.
Hardware for R&D Sensors, hosts, rigs, calibration targets. Modest.
Metrology Surveyor and total-station mobilisation per campaign. Recurring — see the three-tier approach in V1-00 §7.8 for how to keep this affordable.
Software tooling and compute Modest, but a GPU requirement affects both R&D and product cost.
Compliance and certification Frequently underestimated. Scales with the number of target markets.
IP Freedom-to-operate search, patent filings, counsel.
Tooling and NRE Only at V4 and beyond.
Opportunity cost The one most often ignored: what else could this engineering capacity do for Sunrack?

4. Decision rules#

The purpose of a business case is to decide. These rules should be agreed before the numbers are gathered, so that the numbers are not fitted to a conclusion already reached.

Rule Test
R1 — Internal case Do H1 and H2 together justify the R&D spend without relying on H3? If not, the programme is a speculative hardware venture and should be labelled as one.
R2 — Accuracy sufficiency Does the achievable accuracy (Tier B and C) deliver H1 and H2? If yes, stop paying for accuracy beyond it.
R3 — Scope viability If Experiment H shows purlins are not optically locatable (F-12), does the remaining capability still deliver H1 and H2?
R4 — Build versus integrate Could the solar layer be built on a third-party scanner and reach market sooner? If yes, hardware development is a strategic choice about margin and control, not a technical necessity.
R5 — Stop rule What result would cause the programme to stop? Agree this before V1, not after.

R2 and R4 deserve particular attention#

R2 is the rule that protects the budget. The error budget shows Tier B and C are achievable with ordinary hardware while Tier A may be impossible. If Tier B and C deliver the value, then the expensive pursuit of Tier A is optional — and the mass-versus-performance conflict in Finding F-5 largely dissolves, because the compact sensor class is sufficient.

R4 is the uncomfortable one, and it should be asked honestly. The IP strategy §2 concludes that the defensible value is the roof-to-mounting-structure layer, not the scanner. That layer could be developed, and even sold, against third-party scan data while Falcon hardware matures — which would de-risk the whole programme by validating demand before committing to hardware.

The vendor register's two-track SHARE evaluation is, in effect, an early test of R4. It is worth reading in that light rather than purely as a procurement question.


5. Questions for the project owner#

These cannot be answered from the technical documents and only Sunrack's records and judgement can settle them:

  1. What does a roof survey cost Sunrack today, in time and money?
  2. How often does survey error cause rework, and what does an instance cost?
  3. Do EPC customers ask about survey capability, or specify accuracy?
  4. Would a faster, better-documented survey measurably improve win rate or margin?
  5. Is the intent primarily H1, H2 or H3? The honest answer changes the whole programme.
  6. What annual R&D budget is available, and over how many years?
  7. What result would stop the programme?

Question 5 is the one to settle first. An internal-efficiency programme and a product venture have different accuracy requirements, different compliance scope, different IP needs and different acceptable costs — and the current documents, taken together, quietly assume H3 without ever saying so.


6. How this document should be used#

  1. Gather the H1 and H2 inputs from project records — this needs no hardware and no budget.
  2. Agree the decision rules, especially R5, before V1 results arrive.
  3. Test R2 against the achievable tiers in the error budget.
  4. Revisit after V1, when measured performance replaces analysis.

Record the answers in this document. A business case kept in the founder's head cannot be reviewed, challenged or used to say no — and the ability to say no on evidence is what makes the rest of this documentation worth maintaining.

Source: docs/00-project/VALUE_HYPOTHESIS_AND_BUSINESS_CASE.md