1. Technical questions#
Use case and product definition#
- What rooftop size and geometry should one scan cover?
- Is the operator walking around the roof, scanning from ground level, or both?
- Is access to the roof required?
- What is the minimum acceptable completeness of the 3D model?
- Which solar workflow outputs are mandatory?
Measurement#
- How should ±2 cm be defined and tested, if retained?
- What is the required accuracy at 2 m, 5 m, 10 m, 15 m and longer ranges?
- Which surfaces/materials are representative?
- V1-00 defines an independent survey-grade total-station control network with held-out checkpoints; which surveyor/instrument will be used at each site, and what reference uncertainty can actually be demonstrated?
Sensor system#
- Which exact LiDAR SKU is the best first experiment?
- Which exact stereo-camera SKU is the best first experiment?
- Does the selected stereo camera provide useful depth in strong direct sunlight?
- Is a common hardware clock/trigger available?
- What timing accuracy is needed for handheld motion?
- Is LiDAR-internal IMU sufficient or should the camera/rig have an independent IMU?
- Is GNSS necessary for the first prototype or only later georeferencing?
- How will sensor extrinsics remain stable in a handheld enclosure?
Compute and software#
- What host computer can acquire both sensor streams without data loss?
- What is the sustained bandwidth and storage requirement?
- Which operating system, drivers, SDK versions and middleware are supportable?
- Which SLAM/mapping stack is appropriate?
- How should calibration, uncertainty and sensor health be represented?
Handheld productization#
- What overall mass and operating time are acceptable to an operator?
- What heat can the enclosure dissipate in Indian outdoor conditions?
- What are the ergonomic, one-hand/two-hand and display requirements?
- What ingress protection is needed?
- Which components require active cooling?
- What is the expected production volume and target product cost?
SHARE3DCAM — offline data and live SDK qualification#
SHARE is now being assessed on two separate tracks. The evidence must not be conflated:
Track A — offline dataset / algorithm R&D
- SHARE published a 15 July 2026 community case describing a C1 user's exported data package. SHARE says the ROSBAG contains LiDAR point-cloud frames, IMU data, camera images and timestamps; additional files include per-frame pose, GNSS observations, calibration / extrinsics, metadata and logs.
- A third-party pose2colmap project demonstrates processing of SHARE C1 exports. It is not an official SHARE SDK.
- Open risk: this C1 example does not establish that the S20, S20 SE or S100 provides the same data package, schema or permissions. SHARE's description of point-cloud frames also does not prove that unprocessed LiDAR hardware packets are available.
Track B — live device / SDK integration - The official S20 page advertises an Open SDK for device communication, data transfer and operational control, and a microsecond-level system-wide hardware synchronization claim. - SHARE's developer page separately lists Android MSDK 5.17.0 (released 8 January 2026). The page does not establish direct LiDAR / camera / IMU streaming or Ubuntu support. - The LCC Unity SDK is described as a Unity 3DGS visualization / interaction SDK; do not count it as a sensor acquisition SDK. - The S20 quick guide describes SHARE Capture as the standard connection and scan-control workflow. - Open risk: the public Open SDK wording does not identify available APIs, data payloads, live stream behavior, Linux support, synchronization semantics or commercial license.
The earlier vendor support response shared by the project owner said no third-party raw/intermediate access and no SDK/API/developer interface. Its exact model, hardware revision and firmware were not established. Do not silently map that response onto the current S20, nor assume the new public S20 wording invalidates the earlier response. SHARE must clarify both against exact product and firmware versions.
Questions to close 1. Which exact product models and firmware support the Open SDK? 2. What is the SDK name/version, download, API reference, sample code and license? 3. Can an external application start/stop/configure capture and receive data without SHARE Capture? 4. Does it expose raw LiDAR packets, decoded point-cloud frames, camera images, IMU samples, timestamps and calibration independently? 5. What is the processing stage of exported point clouds: sensor-native, filtered, deskewed, colorized or vendor-SLAM processed? 6. What exactly is covered by microsecond-level hardware synchronization, and what skew is measured between sensors? 7. Is a supported Ubuntu x86_64 SDK available? Is ARM64 or ROS/ROS2 supported? 8. Does the exact S20 expose the same ROSBAG/file structure SHARE documents for the C1? 9. Does the license permit Falcon's commercial R&D and eventual product use, including independent derived IP?
Mitigation / acceptance sequence - Offline gate: request a complete raw-data package from the exact model; inspect ROSBAG topics, message types, frame IDs, timestamps, point fields, IMU units/axes, images, calibration and extrinsics on Ubuntu. Preserve the original dataset and document which data is already processed. - Live gate: obtain the SDK and run its official sample on Falcon's intended host; demonstrate acquisition control and each required live stream; quantify inter-sensor offset and drift under static and moving tests. - Commercial gate: confirm SDK license, redistribution/product-use rights, supported firmware and product lifecycle in writing.
Until these gates pass, SHARE remains a conditional offline R&D lead and an unverified live-integration candidate—not an approved sensing component or procurement selection.
2. Risks#
| Risk | Why it matters | Mitigation |
|---|---|---|
| Vendor SDK/data limitations | Could prevent independent fusion or create lock-in | Confirm raw data, SDK license and supported OS before purchase |
| SHARE C1 evidence assumed to apply to S20 | Public raw-data package example is specifically a C1 user workflow; the S20 Open SDK payload is not documented publicly | Obtain model-specific S20 sample dataset and a working S20 SDK demonstration before making a platform decision |
| Marketing specs mistaken for real performance | Range/accuracy may depend heavily on reflectivity and test setup | Verify exact datasheets and run controlled tests |
| Poor synchronization | Small timing offsets can create large geometric errors during motion | Measure clock behavior and test hardware synchronization |
| Ground-truth reference is unavailable or insufficiently accurate | Weak reference control or excessive measurement uncertainty can make absolute-accuracy conclusions invalid | Arrange a competent surveyor and verified total station; adjust a redundant control network; calculate reference uncertainty; restrict claims if the reference uncertainty is too high |
| Calibration drift/mechanical flex | A handheld device may change sensor extrinsics | Rigid frame, calibration verification and thermal/mechanical tests |
| Outdoor stereo degradation | Sunlight, low texture and reflections can reduce depth quality | Field-test the exact camera and operating modes |
| Compute/bandwidth underestimated | High-rate streams may drop data or overheat the host | Profile sustained throughput, CPU/GPU, storage and thermal behavior |
| Premature hardware freeze | May lock the product into an unproven architecture | Keep first prototype modular and reversible |
| Manufacturer IP leakage | Product know-how and design assets may be reused | Contractual IP assignment, limited manufacturing license and access controls |
| Supplier discontinuity | Commercial sensors may be revised or discontinued | Confirm lifecycle and maintain alternate candidates |
2.1 Risks identified by the error-budget analysis (added in 0.5)#
Ranked by expected impact. Each traces to a finding in the Error Budget.
| Risk | Why it matters | Likelihood | Impact | Mitigation |
|---|---|---|---|---|
| The ±2 cm target is quoted externally before validation | Published comparisons put mature handheld products at 10–30 mm, and 10–60 mm outdoors. A public commitment to ±2 cm would be hard to retract and would damage credibility with EPC customers. | High — the figure is already in circulation internally | High | D-015: tiered tolerances. Mark the old table superseded. Prohibit external quotation of any unvalidated figure. |
| Concealed structural members are not optically measurable | Finding F-12. The tightest genuine MMS tolerance concerns purlins under roof sheeting. If unmeasurable, Falcon is a partial survey solution and the product claim changes. | High | High — defines product scope | Experiment H before architecture freeze (FR-05, D-022). Treat a negative result as a valid, valuable outcome. |
| Copyleft licence in the product path | Several leading open-source SLAM implementations are GPL-family. Shipping GPL-derived firmware can oblige source release, undermining the whole IP-ownership model. | Medium-high — the best-performing components are the risky ones | High | LIC-01 from the first commit; software bill of materials; pose estimation confined behind a replaceable interface (D-021, D-024). |
| Software-only synchronisation accepted as adequate | Finding F-8. At 30 °/s a 10 ms offset gives 52 mm error at 10 m. Host jitter routinely exceeds 10 ms, and the resulting error will be misdiagnosed as sensor inaccuracy. | Medium | High | D-018: hard procurement filter. Measure against the 1 ms threshold; record product and R&D verdicts separately. |
| Deskewing omitted or silently broken | Finding F-9. Undeskewed frames smear ~524 mm at 10 m at ordinary panning rates. | Medium | High | Specify as a separable, switchable, independently testable stage. Treat an unexpectedly small difference between on and off as a defect. |
| Calibration validated only at target range | Finding F-10. A 0.2° residual gives 7 mm at 2 m but 52 mm at 15 m — a 7.5× amplification. A calibration that looks excellent can fail silently in use. | Medium-high — this is the natural and comfortable way to calibrate | High | Mandatory verification observations at 8–15 m; report boresight and lever arm separately (FR-08). |
| Ground-truth leakage under campaign pressure | V1-00's rules are strong but depend on sustained human discipline over a long campaign. A leaked checkpoint invalidates the headline result. | Medium | High | SW-06: enforce isolation in software so leakage is mechanically impossible. |
| Mass target versus sensor performance | Finding F-5. The better-performing LiDAR class alone exceeds the <300 g sensor budget, conflicting with the stated vendor preference. | High — already present | Medium | D-023: decide on evidence after V1. Consider split R&D-reference and product sensors. |
| Transform direction or unit error | An inverted transform or mis-specified unit produces a large, systematic, silent error that looks like sensor inaccuracy and can persist for weeks. | Medium-high — a classic failure mode | Medium | Self-describing calibration artefacts; frame names in data not filenames; M1 scale bar in every scan. |
| Conclusions drawn from statistically inadequate samples | At n = 12 the standard error on RMSE is 20 %, so 20 mm and 25 mm are indistinguishable. | High if unaddressed | Medium | D-025: 25 checkpoints; report n and standard error with every metric; no conformance claim without both. |
| Compliance discovered late | Laser classification, radio choice and IEC 62368-1 all constrain architecture and cannot be retrofitted without redesign. | Medium | High | Three activities during V1: laser-safety opinion, radio-module strategy, IEC 62368-1 design commitment. |
| Survey tolerance set tighter than fabrication tolerance | If structures are installed with clamp adjustment absorbing ±25 mm, accuracy beyond that buys nothing — and the sensor debate changes entirely. | Medium | Medium — wasted effort | Answer tolerance question 6 from existing Sunrack project records. Costs nothing and may reset the requirement set. |
| Effort spent competing on SLAM rather than the solar layer | The moat is roof-to-mounting-structure engineering, not pose estimation. Scarce budget spent on SLAM competes with Leica and Faro on their ground. | Medium | High — strategic | IP strategy §2. Integrate competent pose estimation; invest in the solar layer. |
The two to act on first, because both are cheap now and expensive later: the purlin-locatability question (it defines product scope) and the licence review (it protects the business model). Neither needs hardware or budget.
3. Specialist input likely needed later#
- LiDAR/optics engineer.
- Stereo-vision/computer-vision engineer.
- Embedded/Linux/FPGA engineer as architecture requires.
- Sensor-fusion/SLAM engineer.
- Mechanical and industrial-design engineer.
- Power and thermal engineer.
- Manufacturing/DFM/quality specialist.
- IP and manufacturing-contract lawyer.
The team can lead the product and system architecture while engaging specialists to solve domain-specific design problems.