SUNRACK TECHNOLOGIES LLP · PROJECT FALCON

Compliance and Certification Plan

Planning framework — applicability must be confirmed by a qualified compliance consultant for the final design and each target market

Document ID

FALCON-CMP-001

Version

0.1

Status

Planning framework — applicability must be confirmed by a qualified compliance consultant for the final design and each target market

Audience

project leadership, product engineering, the eventual manufacturing partner


1. Why this exists now, before the design does#

Compliance was absent from the Falcon documents. That is a gap with a cost curve: the later a certification requirement is discovered, the more expensive it is to satisfy. Several requirements constrain the architecture — enclosure, laser aperture, radio module choice, battery selection, materials — and cannot be retrofitted without redesign.

Sunrack sells into India, the Middle East, Africa, Europe and South and Southeast Asia. A device designed for India alone and later exported will require rework. Designing once for the widest applicable set is cheaper than certifying repeatedly.

This document is a planning framework, not a compliance determination. Whether any specific scheme applies depends on the final product's classification, functions, radio content and markets. Every item below must be confirmed with a qualified consultant and against the current regulation text. Nothing here is legal or regulatory advice.


2. What drives Falcon's compliance scope#

Product property Compliance consequence
Emits laser radiation Laser product safety classification — architecture-constraining
Contains a lithium battery Battery safety and transport
Contains Wi-Fi or Bluetooth Radio type approval in every market
Mains-charged electronic product Electrical safety and EMC
Electronic equipment placed on market Hazardous substances, e-waste, packaging
Measuring instrument Possibly legal metrology, if measurements are used in trade
Exported from India Destination-market conformity schemes

The two that most constrain design#

Laser safety. Both candidate LiDAR classes are declared Class 1 to IEC 60825-1:2014 as components (official specification — Livox MID-360 and Ouster sensors both declare Class 1). Falcon cannot inherit that classification. Integrating an emitter into a new enclosure, with new optics, new apertures and new fault conditions, creates a new laser product requiring its own classification and declaration — including consideration of single-fault conditions and whether any user-accessible condition could exceed Class 1 limits.

  • PR-11 — The product shall be Class 1 to IEC 60825-1 under all normal and single-fault conditions, classified for the Falcon product and not inherited from a component. Mandatory.

A handheld instrument pointed by an untrained operator, potentially at people, must be Class 1. Anything else is commercially untenable.

Legal metrology. If Falcon's output is used to determine a quantity on which money changes hands — roof area driving a contract price, for instance — legal-metrology rules may apply in some markets. This is not certain and depends on how output is used contractually.

  • FR-12 — The project shall obtain an early opinion on whether Falcon output constitutes a measurement used in trade in its principal markets, and shall state in the product documentation what the output is and is not certified for. Derived.

This is cheap to clarify now and awkward to discover after a customer uses a Falcon-derived area in a contract dispute.


3. India — the home market#

Scheme Authority Applies to Action
BIS CRS (Compulsory Registration Scheme, Scheme II) Bureau of Indian Standards, under MeitY Electronics and IT goods listed in the Compulsory Registration Order Determine whether the product classification falls within a listed category. Testing is at a BIS-recognised laboratory; registration follows.
Safety standard under CRS — — IS/IEC 62368-1 is the safety standard now applied across a broad range of CRS electronics and IT goods. Design to IEC 62368-1 from the outset.
WPC ETA Wireless Planning & Coordination Wing, Department of Telecommunications Any product with Wi-Fi, Bluetooth or other RF Required per model. Self-declaration route (ETA-SD) is available for licence-exempt bands. Obtain before import or sale.
LMPC Legal Metrology (Packaged Commodities) Packaged goods declarations Confirm packaging and labelling requirements.
E-Waste Rules MoEFCC Electrical and electronic equipment Producer registration and compliance obligations.
Battery transport — Lithium cells and packs UN 38.3 test summary required for shipping; IEC 62133-2 commonly required for cell and pack safety.

Design consequences for India#

  1. Design to IEC 62368-1 from the first electronics schematic. Retrofitting it is expensive.
  2. Prefer a pre-certified radio module over a discrete radio design. A module with existing approvals substantially reduces WPC ETA and destination-market radio effort. This is a genuine architecture decision and should be recorded as one.
  3. UN 38.3 is needed to ship prototypes, not just products. It will bite earlier than expected — before the first international demo or customer trial.

4. Export markets#

Sunrack's stated markets, with the principal schemes to plan for. Each requires confirmation per country.

Market Principal route Notes
European Union CE marking EMC Directive; Radio Equipment Directive if radio is present (RED generally subsumes EMC and safety for radio products); hazardous-substance restrictions; general product-safety obligations; packaging and e-waste obligations. Laser safety addressed via the applicable IEC 60825-1 standard.
United Kingdom UKCA Broadly parallel to CE with separate administration.
Gulf states G-Mark / GCC conformity; SASO for Saudi Arabia Per-country requirements vary; some need in-country representation.
Africa SONCAP (Nigeria), KEBS/PVoC (Kenya), SABS/NRCS (South Africa) Many African markets use pre-shipment verification of conformity, which affects shipping schedules, not just design.
United States, if pursued FCC Part 15; laser products are additionally subject to US federal laser product regulation administered by the FDA's CDRH The US laser-product regime is separate from and additional to IEC 60825-1 and needs specific attention if the US is a target.
South / Southeast Asia Per-country; several have radio type approval and safety schemes Confirm per market.

The consolidation strategy#

Most of these regimes draw on a common technical base. Testing once against the strictest applicable requirement and reusing the reports is substantially cheaper than sequential per-market campaigns.

Technical area Test to Reusable for
Product safety IEC 62368-1 India CRS, CE, UKCA, GCC, IECEE CB scheme
EMC emissions and immunity CISPR 32 / CISPR 35 and the IEC 61000-4 series CE, UKCA, most markets
Radio The destination radio standards for the chosen module's bands Reduced by using a pre-approved module
Laser safety IEC 60825-1 Most markets; US requires additional treatment
Battery IEC 62133-2 and UN 38.3 Universal
  • FR-13 — Compliance testing shall be planned as one consolidated campaign against the strictest applicable requirement set, with an IECEE CB scheme certificate obtained where it reduces per-market effort. Derived.

5. Sequencing against the R&D programme#

Compliance work should begin well before design freeze, but most of it is cheap until then.

Stage Compliance activity Cost
Now (V1 R&D) Confirm BIS CRS applicability. Obtain a laser-safety opinion on the intended architecture. Choose a pre-certified radio module strategy. Confirm legal-metrology position (FR-12). Low — mostly advice
Architecture definition Design to IEC 62368-1 and IEC 60825-1. Select battery with IEC 62133-2 and UN 38.3 evidence. Define enclosure, aperture and interlock approach. Low if done now, high if deferred
Pre-production Pre-compliance EMC scan. Laser classification measurement. Battery transport documentation. Moderate
Design freeze Full certification campaign; CB certificate; per-market submissions. High — budget explicitly
Production Partner's production test and conformity controls; marking; declarations; technical file retention. Ongoing

Three things must happen during V1 R&D, because each constrains the architecture: the laser-safety opinion, the radio-module strategy, and the IEC 62368-1 design commitment. None requires a finished design, and each is far cheaper now than after the enclosure exists.


6. Obligations that fall on the manufacturing partner#

The partner manufactures to Falcon's design, on the Foxconn–Apple pattern set out in the Manufacturing and IP Strategy. Compliance responsibility must be allocated explicitly in the contract — it is a common source of dispute.

Item Should sit with
Design conformity to standards Falcon — it owns the design
Technical file and declarations of conformity Falcon — it is the product owner and brand
Production conformity to the approved design Partner
Production test, calibration and records Partner, to Falcon's specification
Component substitution affecting compliance Partner proposes, Falcon approves — never unilateral
Marking, labelling and serialisation Partner executes, Falcon specifies
Traceability and recall support Partner, with defined obligations
  • FR-14 — No component substitution affecting safety, EMC, radio or laser performance shall be made without documented Falcon engineering approval and an assessment of certification impact. Derived.

FR-14 protects both the certification and the brand. An uncontrolled substitution of a radio module or a laser diode can invalidate a certification without any visible change to the product.


7. Open questions#

  1. Does the product classification fall within a listed BIS CRS category? Which entry?
  2. Can the architecture be Class 1 under single-fault conditions with the intended LiDAR, or does it need an interlock or aperture design?
  3. Pre-certified radio module, or discrete radio? Which bands in which markets?
  4. Does Falcon's output constitute measurement used in trade in any principal market?
  5. Which export markets are in scope for the first product release? This determines the certification budget more than any other decision.
  6. Will the partner hold any certifications, or will all be held by Sunrack? Recommended: Sunrack holds all of them, consistent with the IP-ownership model.
  7. What is the realistic certification budget and lead time, and is it in the product plan?

Question 6 matters strategically: certifications held by the manufacturing partner create switching costs and weaken the ownership position that the whole business model is built on.


8. References#

Scheme and authority starting points. Regulations change; confirm current text and applicability before relying on any of this.

Scheme Reference
BIS Compulsory Registration Scheme (Scheme II) bis.gov.in — Scheme II Registration Scheme
WPC Equipment Type Approval Wireless Planning & Coordination Wing, DoT
ISO / IEC standards catalogue iso.org · iec.ch
IECEE CB scheme iecee.org

Standards to obtain and design against: IEC 62368-1 (audio/video, information and communication technology equipment safety), IEC 60825-1 (safety of laser products), IEC 62133-2 (secondary lithium cells and batteries), UN Manual of Tests and Criteria, Section 38.3 (lithium battery transport), CISPR 32 and CISPR 35 (EMC emissions and immunity), and the IEC 61000-4 series (immunity test methods).

Source: docs/06-productization/COMPLIANCE_AND_CERTIFICATION_PLAN.md